Carolina Bulk Sewer Phase 1

CIDB GRADING

8CE

Scope of Works

Construction of:

  • 600mm and 1 050mm diameter HDPE lined concrete pipes at depths up to 7.5m deep with shoring and de-watering of trenches,
  • reinforced concrete manholes,
  • 1050mm and 2 000mm dia concrete sleeve pipes by means of pipe jacking,
  • 1 000mm diameter GRP pipes through 2 000mm diameter concrete sleeve pipe including grouting up after installation,
  • pipe siphon under Berg River complete with associated reinforced concrete structures.

De Hoop Low Cost Housing Phase 2b

CIDB GRADING

8CE

Scope of Works

Construction of bulk and civil engineering services for low cost housing

L’Ormarins Hydro Power Project

CIDB GRADING

8CE

Scope of Works

  1. Construction of a steel helicopter landing pad in the mountain
  2. Construction of a reinforced concrete weir at the abstraction point high up in the mountain
  3. Construction of reinforced concrete plinths for the housing of the pipeline in the mountain
  4. Installation of rock anchor points for the pipeline
  5. Excavation and laying of oPVC pipeline
  6. Installation of HDPE, Ductile Iron and Steel pipelines
  7. Construction of a steel pedestrian and pipe bridge across a gorge, in an inaccessible area of the mountain
  8. Construction of a steel pipe and pedestrian bridge across the stream at the foot of the mountain
  9. Construction of two reinforced concrete water retaining hydro power stations
  10. Grouting in of mechanical equipment
  11. Construction of access roads and associated services

A large potion of the scope of work entailed construction in inaccessible mountain areas where a helicopter was used to place materials.

Exeo received recognition for their contribution to the L’Ormarins Hydro Power Project which won the prestigious CESA AON Engineering Excellence Award.

Penhill Development Project (Phase 1A) Bulk Civil Engineering

CIDB GRADING

9CE

Scope of Works

  1. Construction of a reinforced concrete water retaining sewer sand trap
  2. Construction of two separate in-situ reinforced concrete road bridges across existing detention ponds
  3. Construction of a 15Ml reinforced concrete water retaining reservoir

Symphony Way Dualling between Robert Sobukwe Road and Erica Drive

CIDB GRADING

8CE

Scope of Works

  1. Temporary Traffic Accommodation
  2. Site Clearance
  3. Mass Earthworks
  4. Relocation of existing services and installation of new services
  5. Construction of approximately 16 000m² asphalt surfaced roads and associated road works
  6. Construction of approximately 7 130 m² asphalt sidewalks
  7. In-situ construction of reinforced concrete Rail over Road bridge structure with piled foundations